|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
|
|
|
|
|
Front |
|
|
|
|
Rear |
|
|
Left Side |
|
|
Right Side |
|
|
Front |
|
|
|
|
Rear |
|
|
Left Side |
|
|
Right Side |
|
|
|
|
|
|
|
|
9 |
Road/path existing at site |
|
|
|
|
Existing at site |
|
|
Shown in Tatima |
|
|
|
|
|
|
|
|
|
|
(Upload NOC from HPSEB)
| |
|
|
12 |
|
(Upload NOC from the competent authority)
Click here to apply for NOC from NMA
|
|
|
|
13 |
|
(Upload NOC from the competent authority) |
|
|
|
14 |
No. of trees |
Distance of tree from proposed development if not to be cut (Meter) |
Whether Permission of Competent authority for cutting of trees |
|
|
|
|
(Upload NOC from Forest Department)
|
|
|
|
|
Distance from Forest Boundary (Meter) |
|
|
15 |
|
(Upload NOC from the competent authority along with Site plan)
Click here to apply for NOC from NHAI
|
|
|
|
|
Distance from Nullah (Meter) |
Distance from Khud/HFL of River (Meter) |
|
|
|
|
|
17 |
|
(Upload NOC from the competent authority) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
20 |
|
|
|
|
|
21 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
26 |
General requirements |
|
|
|
|
Slope of land(Degree) |
|
|
|
|
Height of parking floor(Meter) |
|
|
Height of slopping roof(Meter) |
|
|
Height of floor(Meter) |
|
|
Height of building(Meter) |
|
|
Maximum hill cut(Meter) |
|
|
Distance between two blocks(Meter) |
|
|
Plinth height(Meter) |
|
|
Height of Service floor(Meter) |
|
|
Equivalent car Space |
|
|
Buildable width |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
29 |
|
(Upload NOC from the competent authority along with Site plan)
Click here To apply for NOC from AAI
|
|
|
|